top of page
Thayer Academy Performing Arts Center
Braintree, MA
Architect: Eck MacNeely Architects
1/1
Structural Engineering for the 25,000 sf Performing Arts Center connected to the existing Frothingham Hall to provide a combination of Performing Arts and Fine Arts Center. The space concept of the Performing Arts is similar to the original scheme. Structural renovation of Frothingham Hall includes a new elevator and connections to the new building.
-Completed 2008-
bottom of page